Description

1. African Gas & Oil Ltd – 20,000MT LPG Bulk Storage & Handling Terminal

Project Overview

African Gas & Oil Ltd embarked on the development of a state-of-the-art 20,000MT LPG Bulk Storage and Handling Terminal in Shimanzi, Mombasa. This critical infrastructure project was designed to enhance Kenya’s LPG supply chain, ensuring efficiency, safety, and increased storage capacity to meet growing market demands.

Our Role & Expertise

We provided comprehensive engineering and project management solutions from inception to commissioning, ensuring that the facility met the highest industry standards.

Key Services Provided:

  • Project Management – Overseeing the project lifecycle to ensure timely and cost-effective delivery.
  • Conceptualization – Developing a strategic framework for facility design and operations.
  • Front-End Engineering Design (FEED) – Conducting feasibility studies and initial engineering to optimize project outcomes.
  • Detailed Engineering Design – Crafting precise technical specifications for seamless construction execution.
  • Construction Management – Supervising the entire build process to uphold safety, quality, and regulatory compliance.
  • Commissioning – Conducting rigorous system testing and quality assurance to ensure operational efficiency.

Project Timeline:

  • Duration: 2018 – 2019
  • Location: Shimanzi, Mombasa, Kenya

Through strategic planning and technical excellence, this project significantly strengthened the region’s LPG distribution network, enhancing energy accessibility and reliability.

Project Description

20,000MT LPG Bulk Storage & Handling Terminal

Client:

African Gas & Oil Ltd

Category: